Herd Creek Bank Stabilization

Project ID: 048 04 SA

Project Type: salmonid_restoration
Stream Name: Herd Creek Bank Stabilization
Year of Implementation: 2008
Partners: cswcd
Sponsor: LSWCD
Contact: Karma Bragg
Primary Drainage: East Fork Salmon River
HUC: 17060201 (Upper Salmon)
Reconnected: N/A

Sponsoring Organizations

Lemhi Soil Water Conservation District

Project Metrics

Instream Miles Treated: 0.12
Riparian Stream Miles Treated: 0
Stream Miles Opened: 0
Acres Treated: 0.1
Acres Acquired / Protected: 0
Stream Bank Miles Acquired / Protected: 0
Water Savings: 0
Screens Installed: 0
Barrier Removed: No

Species Present

Summary: Not Present

  • Chinook: No
  • Steelhead: No
  • Bull Trout: No

Funding Sources

  • PCSRF: 18900
  • BPA: 0
  • State: 16995
  • In-Kind: 0
  • Other: 0

Project Narrative

Streambank stabilization included 125 feet of bank rocking was installed and six rock barbs were placed along 375 feet of stream bank above the rocking. There was a slight design modification as proposed by the project engineer that increased the length of area treated from 320 feet to 500 feet. Willow clumps were planted between the rock barbs and turbidity monitoring was also performed. Environmental compliance took three years to complete and this required the project sponsor to request an extension to the contract. The total project area including willow plantings along the streambank in the riparian area was 650 feet.

Location

Latitude: 44.071173